Requirements to Utilize LEVGUM's De-vulcanization Technology
To implement LEVGUM’s technology, licensees are required to install a number of roller mills. The size and the number of roller mills will be determined by the desired capacity of the plant, number of working shifts and other related variables.
The embedded files (above) outline what is required to produce 650kg/hour and 2,600kg/hour of DRC in a fully automated plant.
LEVGUM’s process uses common equipment in the rubber industry, i.e., two roller mills as its main machinery.